1- What's the land dimension requires to build 8-10tph animal feed mill plant?
>>Arround 13200 square meters.
2- Can i produce poultry and livestock feed by same feed production line?
>> Yes, you can produce different ages animals feeds by same production line by changing formulas according to your production schedule.
3- How should boiler room and transformer be distributed in the animal feed plant factory?
>> To reduce energy consumption, the boiler and transformer should be placed as close to the main workshop as possible, and the distance between boiler and main workshop no more than 50m.
4- How may staffs do i need to operate the 8-10tph animal feed production line?
>> You need 7 staffs for automatic batching 8-10tph animal feed plant, 2 for raw materials feeding, 1 one pellet machine, 1 for electrical control, 3 for final feed packing and forklift driving.
5- Can we produce pellet feed and mash feed by same one animal feed production line?
>> Yes, you can produce different feed forms such as pellet feed, mash feed by same feed production line, and the process design would be adjusted according to the feed form you want to process.
6- Will you send your engineer to guide the installation and commissioning please?
>> Yes, we will send our engineers to guide the animal feed plant installation and commissioning at site, meanwhile, the staff training also can be arranged during engineer stay at site.
7- Can you supply raw materials steel silo and connect the silo to feed plant directly?
>> Yes, we can produce and supply the raw materials silo and bulk feed silo solution according to your requires, and surely it can supply the raw materials to feed plant directly.
8- What are the benefits of installing feed equipment and steel frame structures at the same time?
>> Installing the equipment and steel structure simultaneously facilitates coordinated construction and effectively manages the construction schedule.
If the equipment is installed after the steel frame, coordination between installation and construction will be significantly worse, and the construction schedule cannot be guaranteed.